Teatulia, Neal Street
This retail unit located near Covent Garden was completed for 3interiors last year with RPR completing the Drylining package.
This retail unit located near Covent Garden was completed for 3interiors last year with RPR completing the Drylining package.
Completed at the same time as the H&M job, in the same building and also for McCues Crafted Fit, this retail unit was also completed to the highest standard.
Working with Verve Concepts on this Luxury high end Apartment overlooking Hyde Park we completed a Drylining package consisting of a Gyplined walls system, Shadow gap and MF Coffer Ceilings.
SAS Ceilings completed at the British Embassy in Germany for Gilbert Ash.
Fit-out at Long Lane for Mc Laughlin and Harveys new offices in London, including MF Walls, Joinery, Glass wall partitions and manifestation, Flooring and Carpets, Blinds, Taping, Joining, Painting and Decorating.
This was a job for 3interiors, we completed the drylining package for this new bar and restaurant just off Londons Oxford Street. Our contract included lay in grid ceilings, metal framed ceilings and robust metal framed walls strengthened with plywood to support an outer layer of marble.
We completed the drylining for WFC, on a proposed five star restaurant on the third floor of the famous Leadenhall building. this was a durable fermacell system of drylining which is a fire resistant, structural and multipurpose board and of which we are a registered installer.
This project for mcCues crafted fit was a drylining package of the renovated Odeon cinema at Lee Valley. The works included mf walls, ceilings, lay in grid ceilings and sylyish floating light coffers showcasing the skill of our fixers in bringing drawings through to fruition.
We did a Drylining project for 3Interiors at the new Flight club Victoria recently. This high end city social darts bar and restaurant is one of two we completed around the same time, the second being in Manchester. Works included, MF Walls and Ceilings, also Grid Ceilings.
Fit-out to an administration building at the channel tunnel for Mc Laughlin and Harvey. Works included Blockwork Package, Drylining package, Painting and Decorating package and a Carpentry package including IPS Panels.
RPR worked with OD interiors on the new world courier distribution warehouse in Feltham. Extensive metal frame walls, ceilings and lay in grid ceiling tiles.
Hi-end Basement Clubhouse for the above luxury apartments which includes a Sauna, Cinema, Lounge, Changing rooms, Gym, Foyer and Meeting rooms. Our Drylining package consisted of MF Walls, Ceilings, Coffer Ceilings, Lay in grid Ceilings, Armstrong Plank Ceilings, and SAS Ceilings. One of two high end clubhouses we had completed over the last the last…
RPR have worked with 3interiors over the last year with several refurbishing and drylining packages over several floors of the Royal Opera House. we have built metal frame walls , ceilings, lay in grid ceilings, STO render, and SPS Envirowall. our works included a new restaurant and bar, a dance studio, a retail unit, and…
RPR completed the drylining package of the lillies square clubhouse for mcCues crafted fit. this was a big project with a gym, cinema, bar, resteraunt, changing rooms, atrium, swimming pool and ancillary rooms. we built metal frame walls, ceilings, wedi board walls to wet rooms, lay in grid tile ceilings and acoustic ceilings. all works…
RPR group have just completed the supply and fit of a fermacell acoustic flooring package in Bloomberg London. The project included the supply and fit of a full fermacell acoustic flooring solution in one of the most innovative and advanced commercial office buildings in Central London. Working for Sir Robert Mc Alpine, one of the…
Early last year we completed a Drylining package on H&MS flagship London store for McCues Crafted Fit. This was a challenging contract, matching, repairing and rejuvenating the Ceilings, Walls, Columns and Beams in this Grade 1 listed building as well building new walls and ceilings throughout.
Fermacell Partitions with Fine Surface Treatment Finish (FST)
Acoustic Partitions and Ceilings & First Fix Joinery to Enable the Fine Finishings
Design Supply and Install External Metal Framing system with Cement Board, Insulation
and Brick Tile System.