Full Fit-Out excluding M&E in Kemsley Kent

Wheelabrator Technologies has submitted a Development Consent Order (DCO) application to the Planning Inspectorate for two waste-to-energy projects. The first is for the construction and operation of Wheelabrator Kemsley (K3) and the second is a new 42MW (gross) waste-to-energy facility, Wheelabrator Kemsley North (WKN). Both facilities are located adjacent to DS Smith’s paper mill in…

Energy from Waste Site at Beddington

The Beddington Energy Recovery Facility (Beddington ERF) is a state-of-the-art plant, operated by Viridor, that safely treats non-recyclable household waste from the four London boroughs of Croydon, Kingston, Merton and Sutton. The waste is combusted at high very temperatures under strictly controlled conditions to generate energy. RPR Group is completing a full fit-out service (excluding M&E).

dry-lining-contractors-in-london

Dry Lining Contractors London

Dry Lining Contractors In London With over 40 years of combined experience, we have been one of the most well-known dry lining company in London, Sussex, and Hampshire that specializes in dry lining commercial, ceilings, and domestic walls. RPR Group has some of the most competent experts equipped with the best tools that work in…